Partmira is a spare parts portal for machine builders. Operators find the right spare part themselves on the interactive exploded view of their machine, opened by serial number. The request reaches inside sales complete and unambiguous: part number, item, and quantity instead of phone, PDF, and back-and-forth.
Manufacturers start from existing drawings and bills of materials. Assemblies stay hidden until approved. Requests arrive as email or CSV; no ERP connection required. Hosted in Germany, GDPR.
Demo and pricing: contact for a demo. No public list prices.


I built Partmira for machine builders whose customers still order spare parts by phone and PDF. The operator opens the exploded view of their own machine with the serial number, taps the item, and the request reaches inside sales with the part number, position, and quantity. Manufacturers start from the drawings and bills of materials they already have. An assembly stays hidden until they approve it. Requests come back as email or CSV, so there is no ERP project to start. We host in Germany. If you run aftersales for a machine builder, tell me whether serial-number lookup or the approval step is the part you would want first.
From the water and wastewater equipment side: serial-number lookup first, no question. Most of the cost sits in the back-and-forth while inside sales works out which pump or valve version the operator actually has. One thing to plan for: plants modified on site, where the as-built no longer matches the original BOM. Can the operator attach a photo to the request when the exploded view and reality differ?
Hi Clemens, starting from the drawings and bills of materials manufacturers already have, and sending requests out as plain email or CSV, takes a lot of the usual ERP pain out of it. What does an operator see if their serial number isn't in the portal yet, say an older machine whose assembly hasn't been approved? I'd be glad to make a free feedback video where I go through the demo as a new user and point out anything unclear or where I get stuck.




I built Partmira for machine builders whose customers still order spare parts by phone and PDF. The operator opens the exploded view of their own machine with the serial number, taps the item, and the request reaches inside sales with the part number, position, and quantity. Manufacturers start from the drawings and bills of materials they already have. An assembly stays hidden until they approve it. Requests come back as email or CSV, so there is no ERP project to start. We host in Germany. If you run aftersales for a machine builder, tell me whether serial-number lookup or the approval step is the part you would want first.
From the water and wastewater equipment side: serial-number lookup first, no question. Most of the cost sits in the back-and-forth while inside sales works out which pump or valve version the operator actually has. One thing to plan for: plants modified on site, where the as-built no longer matches the original BOM. Can the operator attach a photo to the request when the exploded view and reality differ?
Hi Clemens, starting from the drawings and bills of materials manufacturers already have, and sending requests out as plain email or CSV, takes a lot of the usual ERP pain out of it. What does an operator see if their serial number isn't in the portal yet, say an older machine whose assembly hasn't been approved? I'd be glad to make a free feedback video where I go through the demo as a new user and point out anything unclear or where I get stuck.
Find your next favorite product or submit your own. Made by @FalakDigital.
Copyright ©2026. All Rights Reserved